Curtis Woodward
-
Upgrading Bank Station with Dragados UK
The Bank Station Capacity Upgrade is a project which involves improving the public transport for Bank station and improving the station capacity itself, improving the travel time and increasing the frequency of the trains travelling through the station. Bank Station is located in the heart of the City of London’s financial district. A major transport gateway, it is strategically important... -
Monitoring of Rail Infrastructure
The risk to human life through infrastructure failures is one of the biggest risks that face construction and surveying businesses every day. Even the smallest movements can cause long term complications, thus, it is critical that these structures are monitored and kept to the highest safety standards. Survey Solutions, founded in 1997, is one of the UK’s largest engineering surveying... -
Leica Surveying Technology utilised by RiverLinx on London’s Silvertown Tunnel Project
The Silvertown Tunnel is a new 1.4 km twin-bore road tunnel in East London, connecting the Greenwich Peninsula and the west Silvertown district under the River Thames. The design includes the road tunnel, as well as 0.6 km of access ramps, maintenance buildings and an above ground road, including a highway bridge and a footbridge. Due to open... -
Celebrations at the SCCS London Survey Awards!
What a success!! We are pleased to report the legendary SCCS London Survey Dinner returned after a year of unplanned intermission. Over 120 guests met at the prestigious St. Pancras Renaissance Hotel, London for an evening of entertainment, fun and the chance to catch up with friends and colleagues from the survey industry and congratulate the winners of this year's...