SCCS News

  1. GPS900 - GPS Resection

    GPS900 – creating a local coordinate system (sometimes known as an “on-site calibration”) using the “GPS Resection” application program. GPS Resection step-by-step 1. Start the Program • Type in a Name for the resection (grid), select a Job and continue (CONT (F1)). 2. Measuring the local points • Select Point ID of the known local point and occupy it. Hold...
  2. Piping in the Point Cloud with AutoCAD Plant 3D

    The kubit team is honored to co-host this 30 minute webinar with their friends at the Autodesk Plant Solutions team.  This session will demonstrate how point clouds can be used effectively in plant design and integrated with Autodesk's AutoCAD® Plant 3D software. The kubit team will help bridge the gap between clouds and intelligent design.  Learn to accurately model entire Plant 3D...
  3. Cadalyst Webcast To Discuss How To Optimize Point Cloud Use In a Revit Design Workflow

    Boston, Massachusetts, U.S.A. (30 April 2012) - Longitude Media, publisher of Cadalyst, announced today that it will host a free webcast for Autodesk Revit users and managers to discuss the benefits of using 3D scanning and point cloud models in a Revit-based design workflow. The live presentation, titled "Optimize the Use of Point Clouds for Revit Modeling," will be sponsored...
  4. GS08 Network Rover explained:

    GS08 Network Rover explained: GS08 in a nut-shell: GS08 is an lightweight and cable-free “All-in-One GNSS Network Solution” Viva Rover. What do I get in the box? GS08 antenna, CS10 Field Controller, 3 batteries (6-8hrs each), pole clamp & bracket What sort of positional accuracy is achievable with this kit? 10-15mm in plan, 20-25mm in height, when dialling into SmartNet...
  5. Image Assisted Surveying – by what measure is IAS faster than instruments with and without ATR

    Image Assisted Surveying – by what measure is IAS faster than instruments with and without ATR Speed of target aiming (source: Leica Geosystems CH, 5th Jan 2011): Manual: 14.48 s, + 4 s      = 18.48 s ATR: 10.42 s, +4 s              = 14.42 s IAS: 7.02 s, +4 s                  = 11.02 s Based on the typical ‘Measurement Time for...

Items 316 to 320 of 420 total